The National Methane Hydrates R&D Program
The DOE/JIP Gulf of Mexico Hydrate Research Cruise
During this expedition we will maintain a log of information relayed from the chief Scientist on the expedition. Whenever possible, images will be displayed along with the text.
May 17 - Day 31 - Status Report
May 17 - Keathley Canyon 151 - Logging and Coring
Location: Keathley Canyon 151#3
Science Update - May 17:
|
|
Pressure Core Analysis Tools |
Cores 23C, 24C, and 25C taken with the Fugro Corer (FC) core barrel had low recoveries of disturbed sediment. Core 26R was a pressure core taken with the Hyacinth Rotary Corer at or just above the depth of the BSR (383 mbsf) which came up with 140 bar pressure and was successfully transferred. Core 27P was an unsuccessful attempt to get a pressure core just below the BSR.
Plans:
Take an FC core with a temperature measurement as Core 27C at 387 mbsf, then follow with an HRC pressure core and a piezoprobe measurement. Drill down to 440 mbsf and take FC core if time permits. Otherwise condition hole and make ready for wireline logging.
Planning and Data Sheet for KC151 - #3 [PDF-10KB]
Special Report - Pressurized Coring and Analyses Equipment
Special Report - core handling
Special Report - Conventional Wireline Logging Operations in the Gulf of Mexico Gas Hydrate JIP Drilling Program - Timothy Collett, USGS
Maps of drill sites - Shows Keathley Canyon and Atwater Valley locations
Photos:
Coring Photo Gallery - Photos showing pressure coring and analyses equipment
Day 16 Photo Gallery - Photos by NETL scientist showing core analyses process and equipment
Day 13 Photo Gallery - Photos by NETL scientist showing drilling preparation
Day 12 Photo Gallery - Photos by NETL scientist showing core retrieval and processing
Day 10 Photo Gallery - Pressurized core prior to transfer to lab and seabed frame preparation
Day 6 Photo Gallery - Working with push cores and ROV photos of sample collection at AT 14
Day 4 Photo Gallery - Remotely Operated Vehicle (ROV), Sampling, Core Handling
Day 3 Photo Gallery - Preparation for Drilling
Day 2 Photo Gallery Loading the Uncle John [PowerPoint]
The drill ship out to sea - Setting up the lab [PowerPoint]
|