The National Methane Hydrates R&D Program
The DOE/JIP Gulf of Mexico Hydrate Research Cruise

During this expedition we will maintain a log of information relayed from the chief Scientist on the expedition.  Whenever possible, images will be displayed along with the text.

May 16 - Day 30 - Status Report

May 16  - Keathley Canyon 151 - Logging and Coring

Location: Keathley Canyon 151#3

Science Update - May 16:
Fugro Pressure Core (18P) collected a core but it was not under pressure due to a broken liner. Cores 19H and 20H were 8-m FHPC cores that retained gas voids and permitted gas sampling. Core 21H appeared to have reached the penetration limit for the hydraulic piston core, recovering only about 2.5-m of core. Core 22C was a 3-m core obtained with the Fugro Corer. None of these cores had cold spots when imaged by the IR camera, although cores 19H and 20H had significant gas expansion.

Plans:
Continue drilling down with coring every second pipe joint down to 380 mbsf. At 380 mbsf, start continuously coring through the depth corresponding to the seismic BSR (385 mbsf) to 405 mbsf, with pressure cores above and below the depth of the BSR.

Planning and Data Sheet for KC151 - #3   [PDF-10KB] 

Special Report - Pressurized Coring and Analyses Equipment

Special Report - core handling

Special Report - Conventional Wireline Logging Operations in the Gulf of Mexico Gas Hydrate JIP Drilling Program - Timothy Collett, USGS

Maps of drill sites - Shows Keathley Canyon and Atwater Valley locations

Photos:
Coring Photo Gallery - Photos showing pressure coring and analyses equipment
Day 16 Photo Gallery  - Photos by NETL scientist showing core analyses process and equipment
Day 13 Photo Gallery  - Photos by NETL scientist showing drilling preparation
Day 12 Photo Gallery  - Photos by NETL scientist showing core retrieval and processing
Day 10 Photo Gallery  - Pressurized core prior to transfer to lab and seabed frame preparation
Day 6 Photo Gallery - Working with push cores and ROV photos of sample collection at AT 14
Day 4 Photo Gallery - Remotely Operated Vehicle (ROV), Sampling, Core Handling
Day 3 Photo Gallery - Preparation for Drilling
Day 2 Photo Gallery Loading the Uncle John [PowerPoint]
The drill ship out to sea - Setting up the lab [PowerPoint]