Return to NETL Home
 
Go to US DOE
 

Gasification - Project Data
Advanced Gasification Program Element

Co-Production of Substitute Natural Gas / Electricity via Catalytic Coal Gasification

Project ID:

06NT42760
Objective: The overall objective of this project is to develop a commercial application for co-production of electricity and substitute natural gas (SNG) based on a transport reactor-based pyrolysis process, a catalytic fluid-bed reactor for additional methane production and high-temperature high-pressure CO2, sulfur, and ammonia treatments that can produce SNG at a cost of <$5 / MMBtu and produce a high-pressure CO2 by-product stream permitting sequestration of >90% of the CO2 generated.

NETL Contact:

Elaine Everitt (304) 285-4491
Organization: Research Triangle Institute
Project Timeline: Start: 04/01/2006
End:  04/30/2011